項(xiàng)目風(fēng)險(xiǎn)管理-PMP考試章節(jié)練習(xí)(11-15題)11. The project budget has been finalized. Additional work has been discovered that was not planned for in the budget or project scope. Where could the funds be found to cover the newly discovered work item?
A. Contingency reserve
B. Project profit
C. Management reserve
D. Abandoning fund
項(xiàng)目預(yù)算已經(jīng)完成。但是發(fā)現(xiàn)有額外的工作沒(méi)有計(jì)算到預(yù)算或項(xiàng)目范圍中。在什么樣的資金能夠包含最近發(fā)現(xiàn)的工作內(nèi)容?
A. 應(yīng)急備用金
B. 項(xiàng)目利潤(rùn)
C. 管理備用金
D. 廢棄資金
12. As a means of deflecting project risk, the project manager should consider:
A. not implementing the project
B. the use of another project manager
C. establishing a sunk cost fund
D. ignoring the risk
E. insurance whenever possible
作為風(fēng)險(xiǎn)轉(zhuǎn)移的一種方法,項(xiàng)目經(jīng)理應(yīng)該考慮:
A. 不實(shí)施項(xiàng)目
B. 啟用另一個(gè)項(xiàng)目經(jīng)理
C. 建立沉淀資金
D. 忽略風(fēng)險(xiǎn)
E. 需要時(shí)上保險(xiǎn)
13. Which phase of the project life cycle has the highest uncertainty?
A. Conceptual
B. Planning
C. Design
D. Implementation
E. Termination
項(xiàng)目生命周期中哪個(gè)階段有最大的不確定性?
A. 概念
B. 計(jì)劃
C. 設(shè)計(jì)
D. 實(shí)施
E. 中止
14. Which of the following fit the category of external risks?
A. Project delays, budget underruns, movement of city utilities
B. Regulatory, currency changes, taxation
C. Natural disasters, regulatory, design
D. Inflation, design, social impact
E. Political unrest, budget overruns, size and complexity of the project
下面哪種分類屬于外部風(fēng)險(xiǎn)?
A. 項(xiàng)目延遲,預(yù)算超支,城市設(shè)施的遷移
B. 規(guī)章制度,貨幣變化,稅收
C. 自然災(zāi)害,規(guī)章制度,設(shè)計(jì)
D. 通貨膨脹,設(shè)計(jì),社會(huì)方面的影響
E. 政治動(dòng)蕩,預(yù)算超支,項(xiàng)目的大小和復(fù)雜性
15. In the area of legal risks, there are two reasons for licensing of projects. One reason is for revenue generation by the community: the other is for:
A. harassment of the project manager
B. bureaucratic interest in the project
C. public safety of the product
D. monitoring of the project schedule
E. identification of the project manager
在法律風(fēng)險(xiǎn)方面,有兩個(gè)原因給項(xiàng)目發(fā)許可證。一個(gè)是收益由公眾產(chǎn)生,另外一個(gè)是:
A. 不讓項(xiàng)目經(jīng)理閑著
B. 官僚的原因
C. 產(chǎn)品對(duì)公眾的安全
D. 項(xiàng)目進(jìn)度的監(jiān)測(cè)
E. 項(xiàng)目經(jīng)理的識(shí)別
PMP考試練習(xí)答案(風(fēng)險(xiǎn)管理):11-15 CEABC