PMP考試每天一練--2016年P(guān)MP考試模考試題-13
PMP英文試題13-1. After identifying all tasks to be carried out in the project, the project manager allocates the tasks to each team member based on their skills. The project manager refers to which of the following documents? A. Responsibility assignment matrix B. Work breakdown structure C. Resource breakdown structure D. Work package assignment matrix PMP中文試題13-1.在確定項(xiàng)目中所需要開(kāi)展的所有任務(wù)后,項(xiàng)目經(jīng)理根據(jù)每個(gè)團(tuán)隊(duì)成員的技能分配任務(wù)。項(xiàng)目經(jīng)理參考了下列哪一份文件? A.職責(zé)分配矩陣 B.工作分解結(jié)構(gòu) C.資源分解結(jié)構(gòu) D.工作包分配矩陣 PMP參考答案:C.資源分解結(jié)構(gòu) PMP答案解析:估算活動(dòng)資源輸出—資源分解結(jié)構(gòu) ( 6.4.3.2) P165 PMP中文試題13-2.在你的制造型項(xiàng)目中,依據(jù)質(zhì)量控制測(cè)量結(jié)果,管理層認(rèn)識(shí)到需要立即對(duì)材料需求計(jì)劃(MRP)系統(tǒng)采取糾正措施,以將返工控制在最低水平。為執(zhí)行必要的變更,你應(yīng)遵行____。 a.組織的質(zhì)量政策 b.質(zhì)量管理計(jì)劃 c.設(shè)立操作性定義和程序 d.已定義的整體變更控制過(guò)程 PMP參考答案:D |