PMP考試每天一練--PMP考試試題-69
PMP考試試題一: A project manager is assigned to a multiyear project. During creation of the work breakdown structure (WBS), the project team is unable to decompose some of the phases that will occur during later stages of the project. What should the project manager do? A. Conduct rolling wave planning when appropriate B. Return to the requirements gathering stage C. Estimate WBS decomposition for those phases D. Reduce the project scope 項目經理被任命管理一個為期多年的項目。在創建工作分解結構(WBS)過程中,項目團隊無法分解將在項目后期發生的某些階段。項目經理應該怎么做? A. 適當的時候,開展滾動式規劃。 B. 回到需求收集階段 C. 為這些階段預估WBS分解 D. 減少項目范圍 PMP參考答案:A. 適當的時候,開展滾動式規劃。 PMP答案解析:創建WBS工具-專家判斷-滾動式規劃 (5.4.2.2 )P131 PMP考試試題二: During a team meeting, a team member asks about the measurements that will be used on the project to judge performance. The team member feels that some of the measures related to activities assigned to him are not valid measurements. The project is BEST considered in what part of the project management process? A. Closing. B. Monitoring and controlling. C. Executing. D. Initiating. 在一次團隊會議上,一團隊成員索要將用于評估項目績效的測量標準。這位團隊成員認為有些測量標準不符合他所從事的活動。此時,項目處于哪個管理過程組? A. 收尾。 B. 監控。 C. 執行。 D. 啟動。 審題: 此題通過情景的描述讓大家判斷屬于哪個過程組,其中關鍵字在“索要將用于評估項目績效的測量標準。這位團隊成員認為有些測量標準不符合他所從事的活動。” 定位: 框架·單個項目的項目管理過程 執行過程組·實施質量保證·引言 解析: 此題可用排除法,“索要將用于評估項目績效的測量標準。這位團隊成員認為有些測量標準不符合他所從事的活動。”表明績效標準已經確認,而且目前團隊成員正在按照標準工作中,很容易排除A和D。進一步研讀題干很顯然描述的并非實際的測量活動,而是在執行階段的一次會議上討論控制問題,故排除B。 PMP參考答案:C. 執行。 |