PMP考試每天一練--PMP考試試題116
PMP考試試題一: Upon completion of a project ,the project manager archives the project plan, minutes of the status meetings, regulatory reports, and other project documents, After completing the final project report ,what should the project manager do next? A. Distribute the final report to the sponsor. B. Close procurements C. Obtain acceptance of project deliverables D. Update the issue log 完成項目時,項目經理給項目計劃、狀態會議紀要,監督報告和其他項目文件歸檔。在完成最終項目報告后,項目經理下一步應該怎么做? A. 將最終報告分發給發起人 B. 結束采購 C. 獲得項目可交付成果的驗收 D. 更新問題日志 PMP參考答案:A. 將最終報告分發給發起人 PMP答案解析:結束項目或階段引言(4.6)P100 PMP考試試題二: The project manager and procurement manager are meeting with a prospective seller to discuss the amount of reporting that will be needed on the project. The seller wants the contract to allow electronic submission of reports and to designate what specific e-mail addresses should be used for the submission. These contract negotiations occur during what part of the project management process? A. Initiating. B. Planning. C. Executing. D. Monitoring and controlling. 項目經理和采購經理正在和一位潛在的賣方討論項目所需的報告數量問題。賣方希望合同中允許提供電子報告形式,并指定具體的郵件地址。這些合同談判發生在以下哪個階段? A. 啟動。 B. 規劃。 C. 執行。 D. 監控。 審題: 此題的關鍵字為“賣方希望合同中允許提供電子報告形式,并指定具體的郵件地址”,意思就是合同談判已處于討論具體條款階段,即實施采購階段,實施采購屬于執行過程組。 定位: 執行過程組·實施采購·12.2 實施采購 解析: 1、題干描述說明目前是在談判合同的具體條款,即實施采購過程,該過程屬于執行過程組,所以C為正確答案; 2、規劃采購屬于規劃過程組;管理采購屬于監控過程組;啟動過程組中沒有采購管理的過程,所以A、B和D答案的選項都不對; 3、此題的場景“潛在的賣方”是干擾項,讓考生誤認為目前處于規劃采購過程組。“實施采購”就是要在這些“潛在的賣方”中確定合適的賣方。 PMP參考答案:C. 執行。 |