PMP考試每天一練--PMP考試試題170
PMP考試試題一: A project manager plans to procure services from a vendor. The scope of services is clearly defined. However, the project manager expects there will be minor changes in the scope at a later stage. The project manager should use which of the following contract types? A. Fixed-price B. Time and material C. Cost-plus-incentive-fee D. Cost-plus-award-fee 項目經(jīng)理打算向供貨商采購服務(wù)。服務(wù)范圍具有清晰定義。但是,項目經(jīng)理希望在后續(xù)階段服務(wù)范圍的變更較小。項目經(jīng)理應(yīng)該采用下列哪一項合同類型? A.固定總價合同 B.工料合同 C.成本加激勵酬金合同 D.成本加獎勵費合同 PMP答案解析:規(guī)劃采購輸入:合同類型(12.1.1.9) P362 PMP參考答案:A.固定總價合同 PMP考試試題二: A project manager needs to analyze the project costs to find ways to decrease costs.it would be BEST if the project manager looks at: A.Variable costs and fixes costs. B.Fixed costs and indirect costs. C.Direct costs and variable costs. D.Indirect costs and direct costs. 項目經(jīng)理需要分析項目成本,以找到降低成本的方法。他應(yīng)該考慮以下哪項成本? A.可變成本和固定成本。 B.固定成本和間接成本。 C.直接成本和可變成本。 D.間接成本和直接成本。 審題:此題解題的關(guān)鍵是找到題干關(guān)鍵句“項目經(jīng)理”“分析項目成本”和“降低成本”。 定位:成本管理領(lǐng)域的拓展 解析:直接成本和可變成本是直接歸屬于項目或隨工作量而改變的成本,找到降低這些成本的方法才能有效地降低項目成本。 間接成本是無法直接追溯至某個具體項目的成本,因此只能按某種規(guī)定的會計程序進行累計并合理分攤到多個項目中,無法由項目經(jīng)理控制降低,答案B和D排除。 . 固定成本不隨項目變化而變化,也是無法直接追溯至某個具體項目的成本,答案A排除 PMP參考答案:C.直接成本和可變成本 |