PMP考試每天一練-2018年P(guān)MP考試試題90
PMP考試試題一: A project is delayed because one item in the equipment specification is obsolete. A replacement will require a longer lead time.To avoid this situation, the project manager should have done which of the following during project planning? A.Prepared a contingency plan B.Selected a more reliable supplier C.Spent more effort on the Identify Risks process D.Ensured that the item is not on the critical path 由于設(shè)備技術(shù)規(guī)范的某一項(xiàng)被淘汰,項(xiàng)目延期。更換將需要較長(zhǎng)的交付實(shí)踐。為避免這種情況,項(xiàng)目經(jīng)理在項(xiàng)目規(guī)劃期間應(yīng)完成下列哪一項(xiàng)? A.制定應(yīng)急計(jì)劃 B.選擇更為可靠的供應(yīng)商 C.在識(shí)別風(fēng)險(xiǎn)過(guò)程上花費(fèi)更多的精力 D.確保該項(xiàng)不在關(guān)鍵路徑上 PMP答案解析:在識(shí)別風(fēng)險(xiǎn)過(guò)程上花費(fèi)更多的精力,盡早識(shí)別風(fēng)險(xiǎn),避免因更換導(dǎo)致項(xiàng)目延期。A是風(fēng)險(xiǎn),B是減輕,D就算在非關(guān)鍵路徑上一旦發(fā)生也可能會(huì)延期項(xiàng)目 PMP參考答案:C PMP考試試題二 Due to an increased rate of natural disasters along a flood plain, a warehouse director wants to initiate a project to review and update the disaster management plan. Which of the following should the project manager use to identify the project risks? A. Risk probability and impact assessment B. Brainstorming C. Risk rating and ranking D. Flowchart 由于洪泛平原沿線發(fā)生自然災(zāi)害的頻率增加,倉(cāng)庫(kù)主任希望啟動(dòng)一個(gè)項(xiàng)目,審查和更新災(zāi)難管理計(jì)劃。項(xiàng)目經(jīng)理應(yīng)該使用下列哪一項(xiàng)來(lái)識(shí)別項(xiàng)目風(fēng)險(xiǎn)? A.風(fēng)險(xiǎn)概率與影響評(píng)估 B.頭腦風(fēng)暴 C.風(fēng)險(xiǎn)評(píng)級(jí)和排序 D.流程圖 PMP答案解析:信息收集技術(shù)頭腦風(fēng)暴,是識(shí)別風(fēng)險(xiǎn)的工具 PMP參考答案:B |