PMP考試每天一練-2019年PMP考試試題7
PMP考試試題一: An architect creates design drawings for a bridge which will be presented to the client in the next meeting. In an internal design review meeting, the architect realizes there is a flaw in the design that needs to be corrected.What should the architect do next? A.Initiate changes to the requirements B.Initiate the change control process to revise the design C.Escalate the issue to the stakeholders D.Revise the design drawings and present them to the team 一名設計師為一座橋梁制作了設計圖紙,并將在下一次會議上提交給客戶。在內部設計評審會議上,該名設計師意識到設計存在一個缺陷,需要修改。設計師下一步應該怎么做? A.提出需求變更。 B.提出變更控制流程,修改設計。 C.將問題上報給干系人。 D.修訂設計圖紙,并將其提交給團隊。 PMP答案解析:缺陷補救是變更請求的一種,首先應該提出變更 PMP參考答案:A PMP考試試題二 During a time-critical project, various workflows are operating in parallel. Which of the following quality control measures should the project manager apply to indicate when a schedule for one of the workflows is above the upper specification limits? A.Tolerance limits B.Control limits C.Variable sampling D.Attribute sampling 在一個對時間要求嚴格的項目中,不同工作流并行操作。項目經理應應用下列哪一項質量控制措施來表示其中一個工作流的進度高于規格上限? A.公差界限 B.控制界限 C.變量抽樣 D.屬性抽樣 PMP答案解析:公差相當于規格界限 PMP參考答案:A |