PMP考試每天一練-2019年P(guān)MP考試試題10
PMP考試試題一: A buyer and seller sign a contract statement of work. The seller completes the work as specified in the contract; however, the buyer is not satisfied with the results.What is the status of the contract? A.Incomplete B.Waived C.Complete D.Null and void 買方和賣方簽署了一份合同工作說明書,賣方按合同規(guī)定完成工作。然而,買方卻對(duì)工作結(jié)果不滿意。合同狀態(tài)是什么? A.未完成 B.放棄 c.完成 D.無效 PMP答案解析:賣方已按合同規(guī)定完成了工作,只是買方主觀上不滿意 PMP參考答案:C PMP考試試題二 A manufacturing project is under schedule constraints. At the time of delivery, a shipment of components is cancelled, because the components do not meet minimum requirements. In the project management plan, this was identified as a potential liability.The project manager should do which of the following? A.Refer to the quality management plan and verify whether the quality metrics are appropriate B.Survey the industry standards and enterprise environmental factors C.Review the project management plan to create a more realistic schedule D.Review and follow up on the execution of the planned risk responses 一個(gè)制造項(xiàng)目處于進(jìn)度制約之下。交付時(shí),一大批部件被廢棄,因?yàn)檫@些部件未滿足最低要求。在項(xiàng)目管理計(jì)劃中,這被識(shí)別為一個(gè)潛在責(zé)任。項(xiàng)目經(jīng)理應(yīng)該采取下列那種措施? A.參考質(zhì)量管理計(jì)劃并確認(rèn)質(zhì)量指標(biāo)是否適合 B.研究行業(yè)標(biāo)準(zhǔn)和事業(yè)環(huán)境因素 C.審查項(xiàng)目管理計(jì)劃以創(chuàng)建更現(xiàn)實(shí)的進(jìn)度計(jì)劃 D.審查并跟蹤計(jì)劃風(fēng)險(xiǎn)應(yīng)對(duì)措施的執(zhí)行 PMP答案解析:a potential liability翻譯為潛在的責(zé)任、潛在的傾向,可理解為風(fēng)險(xiǎn) PMP參考答案:D |