PMP考試每天一練-2019年PMP考試試題25
PMP考試試題一: Due to a change in governmental regulations, a final product will require an additional feature. A change request to add the feature is discussed and approved within the project.What type of change request is this? A.corrective action B.engineering C.update D.defect repair 由于政府法規的變化,最終產品將需要增加功能。在項目中已經討論并批準增加功能的變更請求。這屬于哪一種類型的變更請求? A.糾正措施 B.工程設計 c.更新 D.缺陷補救 PMP答案解析:更新是對正式受控的項目文件或計劃等進行的變更,以反映修改或增加的意見或內容 PMP參考答案:C PMP考試試題二 A company requires the construction of a 200,000 meter industrial factory capable of producing 10,000 units per day. The facility will be located on unimproved property requiring utilities, access roads, and other infrastructure. What does the project manager need to initiate the project? A.Marketplace conditions and organizational structure B.Historical information and lessons learned C.Project charter and stakeholder register D.High-Level risks and high-level project description 公司要求能夠對一個200,000米、每天生產10,000單位的工業廠房施工。該工廠將設在未經利用的地產中,該地產尚不具備公共設施、進出道路和其他基礎設施。啟動項目時,項目經理需要做些什么? A.市場條件和組織結構 B.歷史信息和經驗教訓 C.項目章程和干系人登記冊 D.高層級風險和高層級項目描述 PMP答案解析:B、C、D三個答案都有選擇的可能性,推薦C答案,作為啟動項目要做的兩個過程 PMP參考答案:C |