PMP考試每天一練-2019年P(guān)MP考試試題43
PMP考試試題一: A company wins a contract to supped specialized parts. During testing, two parts are rejected. The customer returns all parts, stating that the batch is unacceptable. By rejecting the batch, what does this demonstrate? A. Cost aggregation B. Cost of conformance C. Risk reserves D. Cost of nonconformance 公司中得一份合同,供應(yīng)專業(yè)化的零部件。在測(cè)試過程中,有兩個(gè)零部件被拒收。客戶退回所有零部件,聲稱整個(gè)批次都是不合格的。通過拒收整個(gè)批次,這證明了什么? A.成本匯總 B.一致性成本 C.風(fēng)險(xiǎn)儲(chǔ)備 D.非一致性成本 PMP答案解析:商譽(yù)與合同損失屬于非一致性成本 PMP參考答案:D PMP考試試題二 A company works on a project using an innovative and untested technology, What type of contract gives the project the flexibility to redirect a vendor when the scope of work cannot be precisely defined at the start? A. Time and material (T&M) B. Firm fixed price (FFP) C. Cost-reimbursable D. Fixed price incentive fee (FPIF) 一家公司正在執(zhí)行使用—種創(chuàng)新且未經(jīng)測(cè)試技術(shù)的項(xiàng)目。哪種合同類型能為開始時(shí)無法精確定義工作范圍的項(xiàng)目經(jīng)理更改供應(yīng)商的靈活性? A.工料合同(T&M) B.固定總價(jià)合同(FFP) C.成本補(bǔ)償合同 D.總價(jià)加激勵(lì)費(fèi)用合同(FPIF) PMP答案解析:無法精確定義工作范圍,說明范圍相對(duì)確定、但工作量不易確定。而且要有更改供應(yīng)商的靈活性,最適合的是工料合同 PMP參考答案:A |