PMP考試每天一練-2019年P(guān)MP考試試題46
PMP考試試題一: A project manager in a functional organization assigns a resource to an activity. The resource is committed at 100 percent utilization and the schedule performance index (SPI) for that activity is 0.79.What should the project manager do next? A. Recalculate the schedule based on the resource's performance. B. Identify corrective actions with the line manager. C. Reward the resource for an excellent performance. D, Update the progress report based on actual progress. 處于職能型組織的項(xiàng)目經(jīng)理為一項(xiàng)活動(dòng)分配了一名資源。該資源全身心為項(xiàng)目工作,而該項(xiàng)活動(dòng)的進(jìn)度績(jī)效指數(shù)(SPI)為0.79。項(xiàng)目經(jīng)理下一步應(yīng)該怎么做? A.根據(jù)資源的績(jī)效重新計(jì)算進(jìn)度。 B.與直線經(jīng)理一起確定糾正措施。 C.因?yàn)槠鋬?yōu)異的績(jī)效表現(xiàn)獎(jiǎng)勵(lì)該資源。 D.根據(jù)實(shí)際進(jìn)展情況更新進(jìn)度報(bào)告。 PMP答案解析:推薦答案為B,題干重點(diǎn)應(yīng)當(dāng)是放在資源管理權(quán)利上,職能型組織中資源的管理權(quán)利屬于職能經(jīng)理,出現(xiàn)問(wèn)題,需要與職能經(jīng)理一起協(xié)商解決 PMP參考答案:B PMP考試試題二 A project manager completes a large project that requires equipment purchases from a local vendor. Which of the following activities would occur in the close procurements process? A.Updating the procurement management plan B.Updating the terms and conditions of the contract C.Archiving the contract documentation D.Archiving the project management plan 項(xiàng)目經(jīng)理完成了一個(gè)需要從當(dāng)?shù)毓⿷?yīng)商采購(gòu)設(shè)備的大型項(xiàng)目。下列哪一項(xiàng)活動(dòng)將發(fā)生在結(jié)束采購(gòu)過(guò)程中? A.更新采購(gòu)管理計(jì)劃 B.更新合同條款和條件 C.合同文檔存檔 D.項(xiàng)目管理計(jì)劃存檔 PMP答案解析:結(jié)束采購(gòu)的輸出:組織過(guò)程資產(chǎn)更新 PMP參考答案:C |