PMP考試每天一練-2019年P(guān)MP考試試題72
PMP考試試題一: A project manager meets with project stakeholders to report the. project status. In which process is the project manager involved7 A. Control Communications B. Plan Communications Management C. Manage Communications D. Manage Stakeholder Engagement 項(xiàng)目經(jīng)理與項(xiàng)目干系人開(kāi)會(huì),報(bào)告項(xiàng)目狀態(tài)。項(xiàng)目經(jīng)理涉及的是哪一個(gè)過(guò)程? A.控制溝通 B.溝通管理規(guī)劃 C.管理溝通 D.管理干系人參與 PMP答案解析:報(bào)告項(xiàng)目狀態(tài),這是發(fā)布信息,即管理溝通 PMP參考答案:C PMP考試試題二 A project manager organizes a 90-minute international conference call. After the call, the project manager distributes the meeting minutes to all project stakeholders. The financial manager later complains that the issue of requesting additional funds raised during the meeting is not reflected in the minutes. The director of operations also provides feedback that the name of the device causing an issue was written down incorrectly. What should the project manager do to improve future meetings? A. Ask attendees to prepare presentation slides before the meeting. B. Communicate via email rather than conference calls. C. Utilize better conference-call facilities to improve sound clarity. D. Formulate plans for listening-skills training. 項(xiàng)目經(jīng)理組織了一場(chǎng)90分鐘的跨國(guó)電話會(huì)議,會(huì)后他向所有項(xiàng)目干系人發(fā)布了會(huì)議紀(jì)要。之后財(cái)務(wù)經(jīng)理抱怨說(shuō)會(huì)議紀(jì)要沒(méi)有體現(xiàn)他提出的預(yù)算超支請(qǐng)求額外經(jīng)費(fèi)的問(wèn)題。運(yùn)營(yíng)總監(jiān)反饋出現(xiàn)問(wèn)題的機(jī)器名稱也記錄不正確。基于以上情況項(xiàng)目經(jīng)理應(yīng)該優(yōu)先進(jìn)行如下哪項(xiàng)改進(jìn)? A.要求大家在會(huì)議前準(zhǔn)備演示文檔。 B.將電話會(huì)議改為郵件溝通 C.使用更好的電話會(huì)議設(shè)備加強(qiáng)語(yǔ)音清晰度。 D.制定聆聽(tīng)技巧培訓(xùn)計(jì)劃并按時(shí)參加。 PMP答案解析:四個(gè)答案中, A答案代表了非正式書(shū)面溝通,有助于信息溝通的可追溯性 PMP參考答案:A |