PMP考試每天一練-2019年PMP考試練習題97
PMP考試練習題一: for a manufacturing project, the project manager lists valid metrics for the quality management plan. Which of the following should be used? A.Subcontractor terms and conditions, tomato analysis, and Gantt charts B.Risk register, quality checklists, and quality management plan C.Defect density, availability, on-time delivery, and PERT charts D.Defect density, failure rate, availability, reliability, and test coverage 對于一個制造項目,項目經理列出質量管理計劃的有效性測量指標。應使用下列哪一項? A.分包商條款和條件、龍卷風分析和甘特圖 B.風險登記冊、質量核對表和質量管理計劃 C.缺陷密度、可用性、按時交付和PERT圖 D.缺陷密度、故障率、可用性和測試覆蓋 PMP答案解析:質量測量指標的例子。 PMP參考答案:D PMP考試練習題二 A project manager wants to use a statistical method to identify factors influencing specific process variables within the project, What tool or technique should the project manager use? A. Cause-and-effect diagram B. Design of experiments C. Pareto diagram D. Statistical sampling 項目經理希望使用統計方法來識別影響項目中具體過程變量的因素。項目經理使用的是什么工具或技術 A.因果圖 B.實驗設計 C.帕累托圖 D.統計抽樣 PMP答案解析:查找影響因素,通常使用實驗設計和敏感性分析兩個工具,本題目的描述適合實驗設計的工作方法。 PMP參考答案:B |