PMP考試每天一練-2020年PMP考試試題65
PMP考試試題一: Three weeks into a construction project, a contractor encounters an underground water pipe which was not included in the contract. They are verbally instructed by the customer’s representative to divert the water pipe around the construction site.What should the contractor do next? A. Divert the water pipe as instructed B. Submit a change request C. Analyze the impact of the change D. Submit a claim 某個施工項目進入第三周,承包商發現一段地下水管道沒有包含在合同范圍內。他們接到客戶代表的口頭指示,將水管改向繞出施工工地。承包商下一步應該怎么辦? A. 按指示將水管改向 B. 提交變更請求 C. 分析變更影響 D. 提出索賠 PMP答案解析:變更請求需要正式書面。 PMP參考答案:B PMP考試試題二 A company that is sponsoring an expedition hires a project manager to organize and lead it. These types of expeditions are not frequent and the project manager must estimate the expedition's costs.Which of the following techniques should be used to estimate costs for this project? A. Three-point estimation B. Cost aggregation C. Analogous estimation D. Expert judgment 一家公司贊助了一支探險隊,雇傭一名項目經理來組織和領導探險隊。探險隊的探險頻率不高,項目經理必須估算探險隊的成本。若要估算這個項目的成本,應該使用下列哪一項技術? A.三點估算 B.成本匯總 C.類比估算 D.專家判斷 PMP答案解析:ACD都是估算成本的工具,題干沒有提到應對不確定性和風險,排除A。探險隊的探險頻率不高,說明沒有可參照的歷史數據,排除C。 B是制定預算的工具。 PMP參考答案:D |