PMP考試每天一練-2020年P(guān)MP考試練習(xí)題152
PMP考試練習(xí)題一: A project manager is assigned to a project with a rapidly changing environment. The requirements scope is difficult to define in advance, which of the following project life cycle models should assist the project manager to define small incremental improvements and deliver best value to stakeholders? A. Iterative and incremental life cycles B. Adaptive life cycles C. Predictive life cycles D. Phase-to-phase relationships 項(xiàng)目經(jīng)理被分配管理一個(gè)具有快速變化環(huán)境的項(xiàng)目。需求范圍難以提前定義。下列哪一個(gè)項(xiàng)目生命周期模型應(yīng)協(xié)助項(xiàng)目經(jīng)理定義較小的增量改進(jìn),并為干系人提供最大價(jià)值? A.迭代性和增量型生命周期 B.適應(yīng)性生命周期 C.預(yù)測(cè)型生命周期 D.階段到階段關(guān)系 PMP考試答案解析:應(yīng)對(duì)快速變化的環(huán)境,使用適應(yīng)型生命周期。 PMP考試參考答案:B PMP考試練習(xí)題二 As a result of the Control Quality process, change requests are generated and approved by the change control board. What should the project manager do next? A. Evaluate the change requests with the change control board B. Schedule the implementation of the approved changes C. Evaluate the risk if the changes are not implemented D. Perform a root cause analysis to identify the sources of the changes 作為控制質(zhì)量過(guò)程的結(jié)果,產(chǎn)生變更請(qǐng)求,并由變更控制委員會(huì)批準(zhǔn)。項(xiàng)目經(jīng)理下一步該怎么做? A.與變更控制委員會(huì)一起評(píng)估變更請(qǐng)求 B.安排批準(zhǔn)變更的實(shí)施 C.評(píng)估如果不實(shí)施變更的風(fēng)險(xiǎn) D.執(zhí)行根本原因分析確定變更的緣由 PMP考試答案解析:變更請(qǐng)求被批準(zhǔn)了,下一步是更新項(xiàng)目計(jì)劃、實(shí)施變更。 PMP考試參考答案:A |