PMP考試每天一練-2022年P(guān)MP考試模擬題137
PMP考試練習(xí)題一: 一家公司計(jì)劃使用新技術(shù)升級(jí)其銷售點(diǎn)系統(tǒng),提高生產(chǎn)力和競(jìng)爭(zhēng)力。為了盡可能減小技術(shù)風(fēng)險(xiǎn),公司開展了概念驗(yàn)證并制造一個(gè)原型。這種風(fēng)險(xiǎn)應(yīng)對(duì)策略屬于下列哪一項(xiàng)的實(shí)例? A company plans to upgrade its point-of-safe system with new technology to improve products and competitiveness. To minimize the technology risk, the company conducts a proof-of concept and builds a prototype. This risk response strategy is an example of which of the following? A:接受 Accept B:回避 Avoid C:減輕 Militate D:轉(zhuǎn)移 Transfer PMP考試答案解析:減輕措施包括采用較簡(jiǎn)單的流程,進(jìn)行更多次測(cè)試,或者選用更可靠的賣方。還可能涉及原型開發(fā),以降低從實(shí)驗(yàn)臺(tái)模型放大到實(shí)際工藝或產(chǎn)品中的風(fēng)險(xiǎn)。 PMP考試參考答案:C PMP考試練習(xí)題二: 以下哪項(xiàng)是收集需求過程的工具與技術(shù)? A. 控制圖 B. 魚骨圖 C.系統(tǒng)交互圖 D.龍卷風(fēng)圖 PMP考試參考答案:C |