PMP考試每天一練--PMP考試試題120
PMP考試試題一: What is the main objective of the Executing Process group? A. Tracking and reviewing the progress of the project B. Managing stakeholder expectations C. Satisfying the project specifications D. Monitoring the schedule 執(zhí)行過程組的主要目標(biāo)是什么? A. 跟蹤并審查項(xiàng)目進(jìn)度 B. 管理利害關(guān)系者的期望 C. 滿足項(xiàng)目規(guī)范 D. 監(jiān)控進(jìn)度表 PMP參考答案:C. 滿足項(xiàng)目規(guī)范 PMP答案解析:項(xiàng)目整合管理--執(zhí)行過程組引言(4.3)P80 PMP考試試題二: During a routine walkthrough, you discover that a seller has neglected to properly produce a major component of a deliverable. The seller tells you that the component is not included in the contract. What should you do FIRST? A. Insist that the seller follow his quality assurance plans. B. Send a letter to the seller insisting that the contract be adhered to. C. Determine if the seller is correct, and whether the component could be reasonably considered part of the contract. D. Inform the project sponsor of the discrepancy. 在例行檢查中,你發(fā)現(xiàn)一賣方漏做了某一可交付成果中一個(gè)關(guān)鍵零件。賣方告訴你說合同中不包括這個(gè)零件。你首先應(yīng)該怎么做? A. 堅(jiān)持賣方遵循他的質(zhì)量保證計(jì)劃。 B. 給賣方發(fā)封信件,要求他們遵守合同。 C. 確定賣方的說法是否正確。 D. 將此事告訴給項(xiàng)目發(fā)起人。 審題: 此題的關(guān)鍵字為“賣方說合同中不包括這個(gè)零件”,所以首先要明確這個(gè)說法是不是準(zhǔn)確,才能確定下一步怎么做。 定位: 監(jiān)控過程組·控制采購·檢查和審計(jì) 解析: 1、雖然采購管理員可以是項(xiàng)目團(tuán)隊(duì)成員,但他通常向另一部門的經(jīng)理報(bào)告。題干中說賣方告訴你說合同中不包括你經(jīng)檢查發(fā)現(xiàn)的賣方漏做的某一可交付成果中一個(gè)關(guān)鍵零件,所以你首先要對采購進(jìn)行檢查和審計(jì),確定賣方說法是否正確,因此選項(xiàng)C為正確選項(xiàng); 2、選項(xiàng)A是質(zhì)量管理的內(nèi)容,與題干要求無直接關(guān)系,所以不對; 3、選項(xiàng)B是在檢查和審計(jì)后才酌情考慮需采取的措施,而不應(yīng)該首先去做,因此選項(xiàng)B不正確; 4、在真實(shí)情況弄清楚前,不應(yīng)告訴項(xiàng)目發(fā)起人,因此選項(xiàng)D也不對。 PMP參考答案:C. 確定賣方的說法是否正確。 |