PMP考試每天一練--PMP考試試題169
PMP考試試題一: A manufacturing project is conducted under limited time constraints. At the point of delivery. A large batch of components must be scrapped, as they do not meet the industry minimum requirements. What should the project manager have done to prevent this problem? A.Surveyed the industry standards and enterprise environmental factors. B.Initiated quality audits to ensure that the planned quality assurance activities are followed C.Increased the focus on risk identification, mitigation and contingencies. D.Obtained approval from the sponsor to extend project time line. 一個制造項目是在有限的時間約束條件下開展的,交付時,一大批部件必須廢棄,因為他們不滿足行業最低要求。若要防止這個問題,項目經理應該做什么? A.調查的行業標準和企業環境因素 B.引入質量審核,以確保活動質量 C.提高對風險和突發事件的識別,緩解能力 D.獲得贊助商對延長項目時間的批準 PMP答案解析:質量審計目的 (8.2.2.2)P247 PMP參考答案:B. 引入質量審核,以確保活動質量 PMP考試試題二: Who of the following has primary responsibility for establishing design and test specifications? A.Senior management. B.Procurement. C.Engineering. D.Quality control. 誰負責制定設計和測試規范? A.高級管理層 B.采購部門 C.工程部 D.質量控制 審題:此題解題的關鍵是找到題干關鍵句“制定”和“規范”。 定位:質量管理領域的拓展 解析:技術專家應該負責制定具體規范。 PMP參考答案:C.工程部 |